Papers
-
LEB98 (Rome)
-
Bari conference
-
Lisbon conference
-
NSREC94
(Tucson)
TAOS presentation
-
TAOS
slides
LEB98 (Rome) presentation
-
LEB98 slides
To Kevin & Peter
-
talk
CERN Sept. 99 (PS file)
-
talk
CERN Sept. 99 (PDF file)
-
Very preliminary
results on the new MAREBO
-
Fig. 5.
LEB(Rome)
-
Fig. 12.
LEB(Rome)
-
Fig.
14. LEB(Rome)
-
correlation
of the MAREBO chip irradiated up to 24 Mrad
-
irradiated(24Mrad)MAREBO+Detector
at 5k, 10k, 15k, 20k and 25ke
-
irradiated(24Mrad)MAREBO+Detector
at if=0.25, 1, 3, 5 and 10nA
-
ENC of an
irradiated MAREBO+Detector versus IF
-
Time Walk
measurement and simulation
Notes
-
MAREBO
is born !
-
MAREBO
works !
-
Dimensionning
of the mareboard card
-
Bonding
diagramm of MAREBO in JLCC84
.PDF version of electronics talks
-
talk
CERN Sept. 99 (PDF file)
-
talk
CERN Jan. 00 (PDF file)
Description
-
RD19
-
Fig1
-
Fig2
-
Fig2b
-
Fig3
-
Fig4
-
Fig5
-
Fig6
-
RD19.texte
TDR
-
TDR-MAREBO.txt
-
Fig1
-
Fig2
-
Fig3
-
Fig4left
-
Fig4right
-
Fig5left
-
Fig5right
-
Fig6
-
Fig7
More measurements on MAREBO with detector
-
depletion
-80V -> -120V
-
depletion
-80V -> -120V
-
output
of the amp with detector (10000 e)
-
output
of the amp with detector (10000 e)
-
output
of the amp with detector (6000, 8000, 10000, 12000, 14000 e)
-
output
of the amp with detector at different feedback curents (0.25, 1, 2, 3,
5nA)
LB